How long has the Town been planning for this new bridge?
Plans and draft location(s) were evaluated as far back as 2002, and are based on functional studies that determined the most efficient alignment for both sides of the proposed bridge. Current and future land uses, roadway length and grades, bridge span, floodways, impacts to adjacent properties all played a role in choosing the crossing location.

Show All Answers

1. Where will the bridge be located?
2. How was the location of the new bridge decided?
3. Does the new bridge mean changes to the off-leash area?
4. How long has the Town been planning for this new bridge?
5. What steps are required before construction can be scheduled?
6. What happens next?
7. When will the new bridge be ready to use and what will it connect to?