What steps are required before construction can be scheduled?
Before the Town can move forward with the new bridge, Griffin Road will be realigned and upgraded and land acquisition will be completed for the final bridge alignment. After that, the bridge design will be finalized (including engineering review and detailed drawings), and permission will be sought to work in the Bow River from the federal Department of Fisheries and Oceans.